$105.00

Vista Projecting Sign 6"H x 5.90"W

$105.00 Sale price

Regular price $105.00
Item Number: VS-V150WBS3
 
  • (2) V150 (150mm/5.9") aluminum sign holder extrusions, Clear anodize, 6 inch
  • (2) Clear covers(Non-glare on one side) for V150 extrusion (1mm thick), Glossy/Non-lare, 6 inch
  • (4) plastic (ABS) end caps for V150 extrusion, Black
  • (1) Metal (Steel) wall bracket for V150- Standard type, black painted
  •  

          

              

       

      Canva is a free and easy to use tool for sign design needs! When using Canva, please export your artwork as a PDF Print.

      Create Your Art On Canva | AdVision Signs - Pittsburgh, PA

      Below are some helpful videos to get you started creating your designs. If you'd rather leave the design up to the experts, simply contact us to begin the design process.

      Getting Started With Canva 

      How To Design On Canva

      How To Edit Your Canva Design

      How To Share Your Design

      Item Number: VS-V150WBS3
       
    • (2) V150 (150mm/5.9") aluminum sign holder extrusions, Clear anodize, 6 inch
    • (2) Clear covers(Non-glare on one side) for V150 extrusion (1mm thick), Glossy/Non-lare, 6 inch
    • (4) plastic (ABS) end caps for V150 extrusion, Black
    • (1) Metal (Steel) wall bracket for V150- Standard type, black painted
    •  

            

                

         

        Canva is a free and easy to use tool for sign design needs! When using Canva, please export your artwork as a PDF Print.

        Create Your Art On Canva | AdVision Signs - Pittsburgh, PA

        Below are some helpful videos to get you started creating your designs. If you'd rather leave the design up to the experts, simply contact us to begin the design process.

        Getting Started With Canva 

        How To Design On Canva

        How To Edit Your Canva Design

        How To Share Your Design